Hay Civil + Structural was engaged by Flower Hotels to provide structural engineering design and support for a major upgrade to the existing Lake Cathie Tavern. Completed in April 2023, the redevelopment involved extensive refurbishment of the existing venue along with significant new extensions, including a large covered alfresco area and an expanded gaming space.
The project presented several complex challenges — including variable geotechnical conditions, integration with existing structures, legislative requirements relating to gaming areas, and the need to maintain operations throughout construction. Careful planning and sequencing were essential to ensure safety, access, and continuity of service.
A key structural feature was the flyover steel roof above the gaming area, incorporating a large cantilever to support ventilation and open – air flow. While largely unnoticed by pa trons, this element was critical to the functionality and compliance of the space, requiring a refined engineering solution that balanced performance, practicality, and visual discretion.
As the project evolved through both design and construction, Hay Civ il + Structural worked closely with the client, architect, and builder to adapt solutions as needed — ensuring structural integrity while preserving the design intent and operational goals of Flower Hotels.